Day 1; preparations
[table id=12 /]
We finished the caulking around windows, trim boards, etc. Removed any loose paint and applied oil based primer as needed. Also replaced one piece on the garage door trim, some deck boards.
Back-rolling
We back-rolled both coats to push out the air in the texture and replace it with our premium Benjamin Moore paint.
Second coat
We had much hotter than average days for this time of the year and the sun dried our second coat faster than we could take these proof of second coat photos!
Completion date: 4/30/14
Thank you for choosing ELEGANT PAINTING®